The numbers
What it could cost. Every line says where the number came from.
2024 estimate = a first guess from the 2024 write-up, no source yet. Sourced estimate = a typical cost from a published source (listed below), not a quote. The AI Researcher checks every line; a checked number replaces the guess here.
To open
| What | Estimate |
|---|---|
| The wheel, 48 to 60 meters 2024 estimate | $4 to 6 million |
| Or a bigger wheel, 70 to 90 meters 2024 estimate | $10 to 12 million |
| Site work: foundation, power, landscaping 2024 estimate | $1.5 to 2 million |
| Putting the wheel together 2024 estimate | $1 to 1.5 million |
| Permits, licenses, safety checks 2024 estimate | $250,000 |
| 40 to 50 market booths 2024 estimate | $120,000 to 250,000 |
| Two small stages 2024 estimate | $50,000 to 80,000 |
| People movers: 12 to 16 moving walkways, about $1.1 million each sourced estimate | $13.2 to 17.6 million |
| Pedestrian bridges: 2 or 3 new, $1 to 5 million each (a long river crossing can cost far more) sourced estimate | $2 to 15 million |
| Total to open, all of it | About $22 to 49 million |
Each year
| What | Estimate |
|---|---|
| Upkeep of the wheel 2024 estimate | $250,000 to 400,000 a year |
| Insurance 2024 estimate | $100,000 a year |
| Running the people movers, about $100,000 each sourced estimate | $1.2 to 1.6 million a year |
| Ticket for the wheel 2024 estimate | $15 a ride |
| Riders 2024 estimate | 500 to 1,000 a day |
| Booth rent 2024 estimate | $500 to 1,000 a month |
| Income from the wheel, booths and events (before people movers) 2024 estimate | $3.1 to 6.2 million a year |
The people movers are the biggest new cost. They can be built in stages, starting where the walk is longest.
Sources: Angi, moving walkway cost; UNC School of Government, pedestrian bridges (FHWA figures); GoLocalProv, Providence pedestrian bridge.