Back to the river

The numbers

What it could cost. Every line says where the number came from.

2024 estimate = a first guess from the 2024 write-up, no source yet. Sourced estimate = a typical cost from a published source (listed below), not a quote. The AI Researcher checks every line; a checked number replaces the guess here.

To open

WhatEstimate
The wheel, 48 to 60 meters 2024 estimate$4 to 6 million
Or a bigger wheel, 70 to 90 meters 2024 estimate$10 to 12 million
Site work: foundation, power, landscaping 2024 estimate$1.5 to 2 million
Putting the wheel together 2024 estimate$1 to 1.5 million
Permits, licenses, safety checks 2024 estimate$250,000
40 to 50 market booths 2024 estimate$120,000 to 250,000
Two small stages 2024 estimate$50,000 to 80,000
People movers: 12 to 16 moving walkways, about $1.1 million each sourced estimate$13.2 to 17.6 million
Pedestrian bridges: 2 or 3 new, $1 to 5 million each (a long river crossing can cost far more) sourced estimate$2 to 15 million
Total to open, all of itAbout $22 to 49 million

Each year

WhatEstimate
Upkeep of the wheel 2024 estimate$250,000 to 400,000 a year
Insurance 2024 estimate$100,000 a year
Running the people movers, about $100,000 each sourced estimate$1.2 to 1.6 million a year
Ticket for the wheel 2024 estimate$15 a ride
Riders 2024 estimate500 to 1,000 a day
Booth rent 2024 estimate$500 to 1,000 a month
Income from the wheel, booths and events (before people movers) 2024 estimate$3.1 to 6.2 million a year

The people movers are the biggest new cost. They can be built in stages, starting where the walk is longest.

Sources: Angi, moving walkway cost; UNC School of Government, pedestrian bridges (FHWA figures); GoLocalProv, Providence pedestrian bridge.